Fire-access designation and marking details should be confirmed for the exact Houston property by the owner and the applicable responsible designer or authority. Requirements can depend on the approved plan and current jurisdiction. SubsTX and listed striping companies should not be treated as the source of legal interpretation or approval.
The work plan should maintain emergency operations, coordinate temporary closures, protect pedestrians and adjacent vehicles, and address product handling, removed marking material, drainage, ventilation where relevant, and curing. Changes discovered in the field should be documented and referred back to the authorized decision-maker before the affected segment is painted.